Email:star15@alloyssi.com
news
There are 82 domestic silicon metal manufacturers to produce silicon 421 # in which 43 are in production.
February chemical grade silicon metal 421 # main production led by Xinjiang, followed by the Northeast, Sichuan, Yunnan factory started to maintain a low level. The rest of the area started very few. At present, due to environmental protection and power supply and other reasons, Sichuan, Fujian, Yunnan silicon metal plant operating rate will also change in this dry season, including Sichuan, Fujian environmental inspection, has been required to stop production. Part of the factory in early March Stop production, the Yunnan area in the tender power supply, if implemented, some factories or will start in the near future, but the hydropower limit, to supply the production of submerged arc furnace is very limited. There is no substantial progress. The recent chemical silicon metal plant plans to re-production less, the factory has a separate cut to check environmental protection or maintenance will also be resumed after the resumption of production, is expected in March 421 # in the production enterprises to maintain the 40-43 or so.